NEXUS PWR-01

VP Operations Dashboard

0 MW
Current Output
Grid Demand 1000 MW
Budget $50.0k

Target Output Directive

100%
0% (SCRAM) 100% (NOMINAL) 120% (OVERDRIVE)

Higher output generates more revenue but increases stress on all plant systems.

Core Telemetry

Reactor Core Temp
300°C
NOMINAL
Containment Pressure
1.0 atm
NOMINAL
Operations Log DAY 1

Tap a system to view details and assign personnel for maintenance.

Available Personnel

Select system first

CRITICAL FAILURE

Containment breached. The reactor has entered a meltdown state due to systemic failure.

FINAL METRICS
Days Operated:
Power Generated:

Incoming Directive

Welcome, VP of Operations.

Your objective is to meet power generation quotas while preventing a catastrophic meltdown.

  • Adjust Target Output to manage revenue vs. equipment stress.
  • Monitor Systems. High output degrades them faster.
  • Assign Crew to repair failing systems before they reach 0% integrity.
Message